File #: 220420    Version: 1 Name:
Type: Ordinance Status: Passed
File created: 5/5/2022 In control: Neighborhood Planning and Development Committee
On agenda: 5/18/2022 Final action: 5/19/2022
Title: Approving a development plan and a preliminary plat in District B3-2 on about 19.5 acres generally located at N.W. Englewood Road and N. Mercier Drive for multi-family residential uses containing 304 units. (CD-CPC-2022-00044)
Attachments: 1. Fact Sheet, 2. 5-3-2022-KinsleyForest, 3. CPC Disposition Letter, 4. NPD_07_CD-CPC-2022-00044_StaffReport_KinsleyForest, 5. Authenticated Ordinance 220420
Related files: 150398
ORDINANCE NO. 220420

title
Approving a development plan and a preliminary plat in District B3-2 on about 19.5 acres generally located at N.W. Englewood Road and N. Mercier Drive for multi-family residential uses containing 304 units. (CD-CPC-2022-00044)

body
BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

Section A. That a development plan and a preliminary plat in District B3-2 (Community Business (dash 2)) on about 19.5 acres generally located at N.W. Englewood Road and N. Mercier Drive, and more specifically described as follows:

Lot 1: Bounded n by N.W. Englewood Rd, e by N. Mercier Dr. s by Kinsley Forest Estates 2nd Plat, w by Kinsley Forest Estates 1st Plat, Lot 2: bounded n by sl N.W. Englewood Rd, e by N. Summit St, s & w by N Mercier Dr.

is hereby approved, subject to the following conditions:

1. All signage shall conform to 88-445 and shall require a sign permit prior to installation.

2. The developer shall submit an affidavit, prepared by an engineer licensed in the State of Missouri, verifying that all outdoor lighting has been installed in accordance with approved plans and that lighting levels do not exceed that shown on the approved lighting plan at the property lines prior to a certificate of occupancy.

3. The developer shall submit an affidavit, completed by a landscape architect licensed in the State of Missouri, verifying that street trees have been installed in accordance with the approved street tree planting plan and are healthy prior to a certificate of occupancy.

4. The developer shall submit an affidavit, completed by a landscape architect licensed in the State of Missouri, verifying that all landscaping required of the approved plan has been installed in accordance with the plan and is healthy prior to a certificate of occupancy.

5. The developer shall comply with 88-425-08 and screen all dumpsters and utility equipment.

6. The developer shall provide one additional parking space to Lot 2 prior to obtaining a bu...

Click here for full text